Click to view Map. (Flash Player 6.0 or greater required)

 

 

System Description

Tren Urbano is a heavy rail rapid transit project. Phase I of Tren Urbano is 17.2 kilometers in length. The project includes 16 stations, each 138 meters in length, capable of servicing six-car trains. Ten stations are elevated, four are at- or below grade in an open cut, and two are underground.


Tren Urbano begins as an elevated track in Bayamón, is largely at grade through Guaynabo and into Río Piedras, is in a tunnel section through most of Río Piedras, and finally continues elevated through Hato Rey.


The stations include automated fare collection systems with entry and exit fare gates. Vertical access is provided, where necessary, by escalators and elevators. Five of the stations have park and ride lots. Seven of the stations will serve as transportation centers with facilities to transfer between the train and/or bus and público routes.


The system includes 74 rail vehicles, which are powered by 750v direct current from third rail. Vehicle operations are fully automated, controlled by the automatic train control system. Each train consist has two crew members. The stations and rail vehicles are designed to meet the accessibility requirements of the Americans with Disabilities Act.


Tren Urbano includes a maintenance / storage facility in the center of the system between the Torrimar and Martínez Nadal stations. Tren Urbano also has a centrally controlled communications and train control system. The central computers and controls are located in an Operations Control Center in the yards and shops complex.